mer 13/03/2015 No Comments Today we had a 12 m3 container brought. About half of the rubble and crap we found in the kitchen double ceiling fitted in it. So we’ll have to get another one soon. Pim and his dad had 7h to fill it up, tidily so that most would fit. ← Lamps Drains → Leave a Reply Cancel replyYou must be logged in to post a comment.